Description
How to Use
Do the operation with a plastic spatula and by pressing the mortar paste in the joints between clean and dry ceramic tiles. Wall plastering is done 24 hours and floor plastering is done 48 hours after installing ceramic tiles. Remove excess mortar from the surface. The 20 to 30 minutes after jointing and hardening of the mortar, clean the jointed surfaces with a damp cloth and keep them moist for 24 hours.
Reviews
There are no reviews yet.